Standalone

Brooklyn, NY Standalone

Eneon has been awarded the contract to design, integrate, and commission a 5MW/20MWh battery energy storage system for the public utility in Staten Island, NY. The project completion is scheduled for September 2022.

Company

LG Energy Solutions

Location

Brooklyn, NY

Capacity

19.6MWh

Power

4.9MW

Safety

Full NFPA855 Compliance

Project Scope: Design, Procurement, Integration, Commissioning

Eneon has been awarded the contract to design, integrate, and commission a 5MW/20MWh battery energy storage system for the public utility in Staten Island, NY. The BESS is a standalone system that will be utilized for peak shaving and energy arbitrage with the Eneon. Staten Island falls under the jurisdiction of the New York City Fire Department (FDNY) which has implemented some of the strictest safety regulation around battery energy storage in the world. Eneon is pleased to be providing a fully FDNY compliant battery energy storage system for this application. This system will consist of four BESS enclosures rated at 5.697MWh each.

Once installed, the battery energy storage system will provide peak shaving abilities to a local manufacturing facility.

Explore other projects.

Microgrid | Wind + Storage

Inuvik Highpoint Wind

Design of a unique system capable of withstanding the most extreme arctic temperatures in Inuvik, NWT.

Microgrid | Solar + Solar (ac)

Waterton Solar + Storage Microgrid

Design and installation of a battery energy storage system for grid resiliency in Waterton, AB.